A certificate of insurance is a snapshot, not a guarantee — but it's the snapshot you'll be asked for when something goes wrong. Here are the eight things worth verifying against the subcontract on every sub, every job.
1. Limits meet the subcontract minimums
Compare every printed limit to the subcontract, not to a rule of thumb. Common minimums are $1M each occurrence / $2M aggregate for general liability, $1M combined single limit for auto, and $1M each accident for employer's liability — but your subcontract is the source of truth. A certificate showing $500K/$1M on a job that requires $1M/$2M is the single most common miss.
2. Every required coverage line is present
If the subcontract requires an umbrella or excess policy, it has to appear on the certificate. A missing line is a gap, not an oversight — the sub either doesn't carry it or the agent forgot to list it, and either way you can't rely on it.
3. Additional insured is marked — and the right parties are named
ADDL INSD must be checked "Y" on the general liability line, and the description of operations should name the parties the subcontract requires (typically the GC and the owner, sometimes the lender). A "Y" with no names is incomplete.
4. Waiver of subrogation
If the subcontract requires it, SUBR WVD should be "Y" — on GL and usually on workers comp as well. Without it, the sub's carrier can come after you to recover what it paid on a claim.
5. The certificate names your project
"Various Projects" or a blank description of operations is a red flag for a project-specific requirement. Look for the job name or number in the description box.
6. Policies run through the end of the job
Check each line's expiration against your final completion date. A policy that lapses mid-job needs a renewal certificate before it expires — most subcontracts require it 10 to 30 days ahead.
7. Cancellation notice
Standard ACORD 25 wording ("notice will be delivered in accordance with the policy provisions") promises no specific number of days. If your subcontract requires 30 days' notice, the certificate or an endorsement has to say so.
8. The lien waiver matches the money
A conditional progress waiver should match the pay application amount net of retainage — $42,000 gross at 10% retainage means a $37,800 waiver — and its through-date should match the pay app period. A waiver for the gross amount, or one that's a month off, doesn't release what you're actually paying.
Do this automatically
Contract Sentinel reads the subcontract's requirements and checks each sub's certificate and waivers against them — all eight items above — and tells you who's OK to pay. Free for up to 5 subs on 1 project.
See how it worksThis guide is general information about reviewing documents, not legal or insurance advice. Confirm coverage questions with your broker and contract questions with your attorney.